References
Jobs and scope
Job Title: BOILER
Client: 7UP
JOB SCOPE
Mechanical Installation of CG 260 – 16 exhaust piping system to Boiler with Steel supports
Installation of Extractor Fans (. 12 units)
Installation of Ventilation Fans (4 units)
Installation CG 260 – 16 auxiliaries (Pumps, Expansion tanks, 3 way valves , Heat Exchangers) with Support
Thermal Insulation of all the Exhaust Pipe
Thermal Insulation of the Boiler body
Mechanical installation of Feed water system from the feed water tank to the Boiler with all ancillaries
View Pictures Below
Job Scope: Complete Fabrication and Installation of a 60ton Per Hour Soya Beans Post Cleaning Plant
Client: WASIL
View Pictures Below
Client: WASIL VEGETABLE OIL & FATS LTD
Job Description: COMPLETE MACHINE INSTALLATION AND PIPING FABRICATION OF SOLVENT EXTRACTION PLANT (SEP); CAPACITY: 600TPD -SB; 300TPD – SN/PK; 250TPD – RB.
View Pictures Below



Client: Nnamdi Azikiwe International Airport, Abuja.
Job Description: Installation of 12 Megawatt CAT Power Plants.
View Pictures Below


